Fuel oil system

Please note in particular our information under:
  • Performance specification

    If you decide to set up and operate a heating oil system,
    a notification to the water authority is required. The following must be notified:

    • the construction of underground facilities (regardless of the storage quantity),
    • the construction of above-ground installations with more than 1 000 litres of heating oil ("above-ground" also includes storage in the cellar of a building) and
    • any significant changes and the decommissioning of the installation
  • Which documents are required?

    Special information for - District of Waldeck-Frankenberg
    • Fully completed notification form for heating oil installations

    Notification form and expert lists

  • Legal basis

  • What else should I know?

    The notification of the heating oil installation must be made in writing.


Who do I need to contact?

The lower water authorities, which are located at the district committee and the magistrate of the independent cities, are responsible.